In Killwangen, a challenging plot right by the station became an institutional capital investment. Over four years, smzh guided the process through the decisive value stages: potential, structure, permitting, capital, implementation, leasing and handover to a Swiss pension fund.

10 existing units
Small-scale use on a challenging plot right by the station.
Railway line, main road, open watercourse, flood protection and design plan: several conditions that could have stopped the project.
58 new residential units
Institutionally investable: Minergie-certified, turnkey, sold as an asset deal to a Swiss pension fund.
Blue marks a value jump.
The proximity to the station made the location attractive. Yet, the railway line, main road, open watercourse, flood protection and design plan significantly increased its complexity. What mattered was not to treat these conditions in isolation, but to bring them together in building-law, technical and economic terms. This is how a challenging location became a permittable and buildable project.

Decisive progress was not achieved in any single phase, but in the interplay of property access, usage concept, permitting, financing, lease and sale.
The price of the land, permittable volume, financeability, and later return had to be aligned. It is only as a result of this alignment that the project became an institutionally viable capital investment.
The handover to a pension fund was possible because use, Minergie standard, lease, documentation and yield logic were aligned to institutional buyers early on.
Whether we talk about an existing property, a development, financing, lease or sale: we assess your starting position and show which next steps matter for structure, capital, implementation or exit.